The UK’s preferred phased approach or “Managed Transition” to any possible future UK changeover
to the euro was published in the third outline National Changeover Plan. Following
wide informal consultation with our key stakeholders, the Draft Managed Transition
Plan sets out what euro services would be available in the event of a UK changeover,
when they would be available, and who would provide them.
The document will be reviewed periodically and comments from interested stakeholders are welcome.
If you have any comments, they should be emailed to: euro.info@hm-treasury.gsi.gov.uk or sent to:
Euro Preparations Unit
HM Treasury,
Area 3/n1,
1 Horse Guards Road,
London,
SW1A 2HQ
The whole document is available in PDF, click here (600KB).
This is a large document. Click on a chapter title below to view the relevant pdf.
The size of the pdf is indicated at the end of the section heading.
In the content section, delete the text in brackets in the first five sections [eg. (pre-D), (D to R), (R to T) etc]
NOTE ON THE STATUS AND PURPOSE OF THIS DRAFT MANAGED TRANSITION PLAN
(72 KB)
BACKGROUND AND INTRODUCTION (130 KB)
MANAGED TRANSITION PLAN
|